TPP Prj. #

Agency

Facility

Location

Improvements/Project Type

Estimated Cost

76

Camas

38th Ave.

Parker to Bybee

Widen from 2 to 3 lanes

$4,468,000

77

Camas

NW Brady Rd.

NW 25th Ave. to NW 16th Ave.

Widening, installation of bike lanes, shared use path

$985,000

78

Camas

NW 16th Ave.

Payne Rd. to NW Hood St.

Widening, bike lanes, restoration

$766,000

79

Camas

Tidland St.

NW 16th Ave. to NW 18th Ave.

Improve

Not available

80

Camas

NW 18th Ave./SE Payne Rd.

Tidland St. to NW Pacific Rim Blvd.

Improve

Not available

81

Camas

NW 23rd Ave./NW Cascade

18th Ave. to NW Sierra

Street widening; engineering only, not construction

$47,000

82

Camas

NW 23rd Ave.

NW Astor to NW Sierra

Shared use path

$33,000

83

Camas

ITS system enhancement.

Citywide

In coordination with VAST improvements, install fiber and signal controller to improve signal coordination and efficiency.

$1,006,000

84

Camas

   

Street lighting

$400,000

85

Camas

Areawide signal system

Citywide

Signal system study to determine future needed signals

$50,000

86

Camas

   

15-30 acres of right-of-way (ROW) acquisition for road improvement projects

$7,000,000

  Camas TBD   Pavement maintenance— overlays, surface treatments
$6,000,000

88

Clark County

Andresen/Padden interchange

 

Interchange

$15,000,000

89

Clark County

Hazel Dell Ave. at 63rd Ave.

 

Interchange upgrade

$350,000

90

Clark County

Hazel Dell Ave. at 78th St.

 

Interchange upgrade

$500,000

91

Clark County

Hazel Dell Ave. at 99th St.

 

Interchange upgrade

$500,000

92

Clark County

Hwy. 99

NE 99th St. to NE 117th St.

Upgrade, 5 lane

$3,300,000

93

Clark County

NE 10th Ave.

NE 134th St. to NE 154th St.

Upgrade, 3 lane

$5,700,000

94

Clark County

NE 10th Ave.

NE 154th to NE 164th St.

Extension/upgrade, 2 lane

$6,000,000

95

Clark County

NE 119th St.

Salmon Creek Ave. to NE 72nd Ave.

Upgrade, 3 lanes

$10,800,000

96

Clark County

NE 119th St.

NE 72nd Ave. to SR-503

Upgrade, 5 lanes

$20,200,000

97

Clark County

NE 119th St.

SR-503 to NE 172nd Ave.

Upgrade, 3 lanes

$16,500,000

98

Clark County

NE 137th Ave.

Vancouver city limits to Fourth Plain

Upgrade, 3 lanes

$3,600,000

99

Clark County

NE 137th Ave.

NE 99th St. to NE 119th St.

New road, 3 lanes

$5,700,000

100

Clark County

NE 137th Ave./ 142nd Ave.

NE 119th St. to NE 199th St.

New road, 3 lanes

$25,100,000

101

Clark County

NE Delfel Rd.

NE 179th St. to NE 184th St.

Realigned, 3 lanes

$1,500,000

102

Clark County

NE 20th Ave.

NE 154th St. to NE 15th Ave.

Upgrade, 3 lanes

$3,000,000

103

Clark County

NE 15th Ave.

NE 179th St. to SR-502

New road, 3 lanes

$5,800,000

104

Clark County

NW 179th St.

I-5 to NW 11th Ave.

Upgrade, 5 lanes

$4,000,000

105

Clark County

NE 179th St.

NE 10th Ave. to NE 29th Ave.

Upgrade, 5 lanes

$16,300,000

106

Clark County

NE 182nd Ave. at NE 159th St.

 

Intersection upgrade

$500,000

107

Clark County

NE 88th St.

Hazel Dell Ave. to Hwy. 99

New road, 3 lanes

$8,100,000

108

Clark County

NE Hwy. 99 at NE 63rd St.

 

Intersection upgrade

$500,000

109

Clark County

Padden Pkwy.

SR-503

New interchange

$17,000,000

110

Clark County

NE 179th St.

NE 29th Ave. to Cramer Rd

Upgrade, 3 lanes

$16,100,000

111

Clark County

NE 192nd Ave.

SE 1st St. to NE 18th St.

Upgrade, 5 lanes

$5,000,000

112

Clark County

NW 11th Ave.

NW 139th St. to NW 146th St.

Upgrade, 3 lanes

$5,000,000

113

Clark County

NE 199th St.

NE 10th Ave. to NE 72nd Ave.

Upgrade, 3 lanes

$16,000,000

114

Clark County

NE 55th/58th Ave.

NE 78th St. to NE 88th St.

New road, 2 lanes

$3,600,000

115

Clark County

NE 99th St.

NE 172nd Ave. to Ward Rd

New road, 2 lanes

$400,000

116

Clark County

NE 99th St.

St. Johns Rd to SR-503

New road/upgrade, 3 lanes

$11,400,000

117

Clark County

NE 99th St.

SR-503 to NE 172nd Ave.

Upgrade

$14,600,000

118

Clark County

Rosewood Ave.

NE 102nd Ave. to NE 105th Ave.

Upgrade, 3 lanes

$600,000

525

Ridgefield

Pioneer Street

½ mi. west of 45th to I-5 NB ramps

Widen, 4 lanes

$13,000,000

526

Ridgefield

South 10th Street

Pioneer St. extension to NE 10th Ave.

Build, 3 lanes

$2,782,000

527

Ridgefield

NE 10th and 264th Avenue

Intersection

Widen

$602,000

528

Ridgefield

South 35th Ave.

SR 501 to South 15th St.

Build, 2 lanes

$1,448,000

529

Ridgefield

Reiman Rd.

SR 501 to North 10th St.

Widen

$3,353,000

530

Ridgefield

Hillhurst Rd. and South Royle Rd.

Intersection

Widen

$722,000

531

Ridgefield

Hillhurst Rd.

SR 502 to Royle Rd.

Widen

$4,053,000

532

Ridgefield

New lane

I-5 to Pioneer St.

Construct NB deceleration lane

$282,000

533

Ridgefield

New lane

Pioneer St. to I-5

Construct SB acceleration lane

$562,000

534

Ridgefield

New lane

Pioneer St. to I-5

Construct NB acceleration lane

$562,000

535

Ridgefield

Pioneer Street

½ mi. west of South 45th

Widen, 3-4 lanes

$4,178,000

536

Ridgefield

Timm Road

South 6th Way to South 15th St.

Widen

$999,254

537

Ridgefield

8th Street

Pioneer St. to Division St.

Upgrade/ extend

$1,166,000

538

Ridgefield

Main Street

Depot St. to City limits

Upgrade

$288,000

119

Vancouver

15th St.

At D St.

New signal

$300,000

120

Vancouver

6th St.

Columbia to Esther

Pedestrian crossing/access management enhancements

$250,000

121

Vancouver

Andresen Rd.

At MacArthur Blvd.

Intersection improvement/roundabout

$300,00

122

Vancouver

Broadway Ave.

Fourth Plain to 27th St.

Minor widening to eliminate intersection offset

$150,000

123

Vancouver

Columbia St.

At 6th St.

Intersection improvements

$150,000

124

Vancouver

 

Downtown

Traffic signal and system project to improve intersections, signal upgrades and communications interconnect

$1,750,000

125

Vancouver

E Mill Plain Blvd.

At 136th Ave.

Intersection modification/widening

$1,250,000

126

Vancouver

E Fourth Plain Blvd.

I-5 to I-205

ITS communications and signal upgrades

$912,000

127

Vancouver

E Mill Plain Blvd.

At D St.

New signal

$300,000

128

Vancouver

E Mill Plain Blvd.

At Chaklov Dr.

Intersection modification/widening to add a SB to WB turn lanes and others

$1,000,000

129

Vancouver

E Mill Plain Blvd.

At Garrison Rd.

Intersection modification/signal upgrade

$300,000

130

Vancouver

E Mill Plain Blvd.

At SE 155th Ave.

New signal

$250,000

131

Vancouver

Esther St.

At 6th St.

Intersection modification/ roundabout

$350,000

132

Vancouver

Esther St.

4th St. to 5th St.

Street modification—-lowering grade

$350,000

133

Vancouver

Esther St.

At railroad berm

Add new street access portal through railroad berm

$2,583,000

134

Vancouver

Fourth Plain Blvd.

At Norris Ave.

Intersection enhancement-signal

$300,000

135

Vancouver

Fruit Valley Rd.

Whitney Rd to NW 78th St.

Temporary safety improvement, shoulder widening, lane narrowing, turn lane at Bernie

$510,000

136

Vancouver

Hearthwood Blvd.

At SE 1st St.

Intersection modification/ roundabout

$300,000

137

Vancouver

Mill Plain, 164th Ave., Burton Rd., Andresen Blvd., Fourth Plain Blvd., Main St.

Every 0.5 miles

Install ITS arterial detectors to manage system

$1,700,000

138

Vancouver

Mill Plain Blvd., Fourth Plain Blvd., 164th Ave, 192nd Ave., Burton Rd., Andresen Blvd., 112th Ave., Thurston Way, Van Mall Dr.

 

Install closed circuit TV cameras for detection on major urban arterials

$1,600,000

139

Vancouver

Mill Plain Blvd., Fourth Plain Blvd., 164th Ave., 192nd Ave.

 

Install probe vehicle detectors to manage traffic flow on select corridors

$700,000

140

Vancouver

   

ITS VAST traffic management center and equipment

$500,000

141

Vancouver

13th St.

At Jefferson and Kauffman

Street reconfiguration to remove offset intersection

$645,000

142

Vancouver

Main St.

At NE 37th Ave.

Signal upgrade

$200,000

143

Vancouver

Main St.

At 33rd St.

Intersection improvement for capacity/safety

$250,000

144

Vancouver

Main St.

At NE 39th St.

Intersection improvement for capacity/safety

$500,000

145

Vancouver

McGillivray Blvd.

At SE 166th Ave.

 

$250,000

146

Vancouver

McGillivray Blvd.

At Village Lp. Rd.

Intersection modification/safety

$300,000

147

Vancouver

NE 104th Ave

14th St. to 18th St.

New street connection—corridor completion

$2,675,000

148

Vancouver

NE 122nd Ave.

NE 39th St. to NE 49th St.

Upgrade to urban collector standard

$1,000,000

149

Vancouver

NE 137th Ave

NE 39th St. to north city limits

Upgrade to minor arterial standard

$6,150,000

150

Vancouver

NE 138th Ave.

NE 18th St. to NE 28th St.

Upgrade to minor arterial street

$7,125,000

151

Vancouver

NE 138th Ave.

NE 28th St. to NE 39th St.

Upgrade to minor arterial standard

$4,850,000

152

Vancouver

NE 18th St.

NE 97th Ave. to NE 138th Ave.

Upgrade to arterial standard with new signals

$28,858,000

153

Vancouver

NE 18th St.

NE 138th Ave. to NE 162nd Ave.

Upgrade to arteral standard with new signals

$13,232,000

154

Vancouver

NE 4th St.

Western terminus to SE 1st St.

New street connection to arterial standards

$1,268,000

155

Vancouver

NE 94th Ave.

Van Mall Dr. to NE 54th St.

Upgrade to collector arterial standard

$1,200,000

156

Vancouver

NE Van Mall Dr.

NE Andresen Rd. to NE 66th Ave.

New street connection to arterial standard

$732,000

157

Vancouver

NW 26th Ave.

Fourth Plain to Fruit Valley Rd.

New street minor arterial/industrial standard

$12,550,000

158

Vancouver

NW 39th St.

At Columbia St.

Intersection modification/ safety/capacity

$250,000

159

Vancouver

SE 10th/ McGillivray

At Chkalov Dr.

Intersection modification/signal

$300,000

160

Vancouver

SE 136th Ave.

At SE 7th St.

Intersection modification/access control/signal

$350,000

161

Vancouver

SE 164th Ave.

At McGillivray

Intersection modification/safety

$401,000

162

Vancouver

SE 164th Ave.

At SE 34th St.

Intersection modification/capacity

$1,250,000

163

Vancouver

SE 164th Ave.

At SR-14 EB on-ramp

Ramp modification for capacity

$1,500,000

164

Vancouver

SE 166th Ave.

Approx–imately SE 15th St. to SE 20th St.

New connector access road

$800,000

165

Vancouver

SE 188th Ave.

E Mill Plain Ext. to SE 1st St.

New street—arterial connection

$625,000

166

Vancouver

SE 1st St.

SE 164th Ave to E city limits

Upgrade to modified principal arterial standard

$2,385,000

167

Vancouver

SE 20th St.

At SE 176th Ave.

Intersection control (urban roundabout)

$300,000

168

Vancouver

SE 20th St.

SE 192nd Ave. to Camas

New street connection—minor arterial standard

$1,750,000

169

Vancouver

St Johns Blvd.

Ft Vancouver Way to E 33rd St.

Street enhancement/access management for capacity/safety

$750,000

170

Vancouver

Vancouver Mall Dr.

Loop Rd. to Fourth Plain

Minor widening and signal upgrades for capacity

$500,000

171

Vancouver

Vancouver Mall Dr.

Extension: Andresen to 66th

New street connection—collector arterial

$807,000

172

Vancouver

VAST III

ITS system deployment and maintenance

Signal/ITS system deployment

$2,024,000

173

Vancouver

W Mill Plain Blvd.

At Columbia St.

Signal modification/upgrade

$250,000

174

Vancouver

Andresen Rd.

Fourth Plain Blvd. to 40th St.

Pedestrian safety & mobility

$165,000

175

Vancouver

W 7th St.

I-5 overcrossing

Pedestrian safety & mobility

$4,406,000

176

Vancouver

Lincoln Ave.

NW 43rd St. to Bernie Dr.

Pedestrian safety & mobility

$490,000

177

Vancouver

Mill Plain Blvd.

Reserve St. to Brandt Rd.

Pedestrian safety & mobility

$184,000

178

Vancouver

Fourth Plain Blvd.

Todd Rd.

Pedestrian safety & mobility

$150,000

179

Vancouver

North half Vancouver Mall Lp.

NE 82nd Ave. to Vancouver Mall Dr.

Pedestrian safety & mobility

$147,000

180

Vancouver

49th St.

15th St. to St. James Rd.

Pedestrian safety & mobility

$441,000

181

Vancouver

Mill Plain Blvd.

NE 155th Ave. to 160th Ave.

Pedestrian safety & mobility

$200,000

182

Vancouver

Pedestrian education program

Citywide

Pedestrian safety & mobility

$75,000

183

Vancouver

Andresen Rd.

Evergreen Blvd. to Highland Dr.

Pedestrian safety & mobility

$76,000

184

Vancouver

McGillivray Blvd.

Chkalov Dr. to Talton Ave.

Pedestrian safety & mobility

$342,000

185

Vancouver

Franklin St.

NW 48th St. to NW 54th St.

Pedestrian safety & mobility

$152,000

186

Vancouver

McGillivray Blvd.

Talton Ave. to 18th St.

Pedestrian safety & mobility

$73,500

187

Vancouver

33rd St.

I-5 to Grand Blvd.

Pedestrian safety & mobility

$310,000

188

Vancouver

Andresen Rd.

Buena Vista Dr. to Iowa St.

Pedestrian safety & mobility

$120,000

189

Vancouver

Fourth Plain Blvd.

Whitman to 83rd Ave.

Pedestrian safety & mobility

$200,000

190

Vancouver

Sidewalk maintenance program

Citywide

Pedestrian safety & mobility

$500,000

191

Vancouver

Main St.

W 33rd St. to NW 39th St.

Pedestrian safety & mobility

$50,000

192

Vancouver

Grand Blvd.

Columbia House Blvd. to 5th St.

Pedestrian safety & mobility

$147,000

193

Vancouver

Evergreen Blvd.

Blandford Dr. to SR-14

Pedestrian safety & mobility

$294,000

194

Vancouver

F St.

McLoughlin Blvd. to 39th St.

Bicycle & trail

$50,000

195

Vancouver

Macarthur Blvd.

Mill Plain Blvd. To Lieser Rd.

Bicycle & trail

$40,000

196

Vancouver

Nicholson Rd.

Burnt Br. Greenway trail to Falk Rd.

Bicycle & trail

$30,000

197

Vancouver

McLoughlin Blvd.

Franklin St. to C St.

Bicycle & trail

$20,000

198

Vancouver

NE 107th Ave.

NE 14th St. to NE 18th St.

Bicycle & trail

$80,000

199

Vancouver

NE 148th/NE 152nd Ave.

NE 18th St. to NE 48th St.

Bicycle & trail

$60,000

200

Vancouver

NE 40th/41st/77th

Andresen Rd. to Vancouver Mall Dr.

Bicycle & trail

$60,000

201

Vancouver

NE 41st St.

NE 112th Ave. to NE 122nd Ave.

Bicycle & trail

$35,000

202

Vancouver

NE 65th Ave.

Fourth Plain Blvd. to 18th St.

Bicycle & trail

$50,000

203

Vancouver

Lincoln Ave.

Mill Plain Blvd. to NW 39th St.

Bicycle & trail

$100,000

204

Vancouver

Plomondon St.

Falk Rd. to Stapleton

Bicycle & trail

$35,000

205

Vancouver

Jefferson St.

W 8th St. to W 13th St.

Bicycle & trail

$60,000

206

Vancouver

Main St.

Fourth Plain Blvd. to 45th St.

Bicycle & trail

$15,000

207

Vancouver

E/NE Mill Plain Blvd.

E Reserve St. to Brandt Rd.

Bicycle & trail

$60,000

208

Vancouver

Highway 99

Main St. to 63rd St.

Bicycle & trail

$2,000,000

209

Vancouver

Mill Plain Blvd.

C St. to Columbia St.

Bicycle & trail

$10,000

211

Vancouver

Bicycle Rack Program

Citywide

Bicycle & trail

$75,000

212

Vancouver

Bicycle Education Program

Citywide

Bicycle & trail

$100,000

213

Vancouver

5th St.

E Reserve St. to Evergreen Blvd.

Bicycle & trail

$95,000

214

Vancouver

NE 54th St.

Ross St. to St. James Rd.

Bicycle & trail

$40,000

215

Vancouver

NE 54th St.

NE 82nd Ave. to NE 94th St. Ave.

Bicycle & trail

$50,000

216

Vancouver

Devine Rd.

18th St. to Buena Vista Dr.

Bicycle & trail

$20,000

217

Vancouver

39th St.

F St. to Fruit Valley Rd.

Bicycle & trail

$20,000

218

Vancouver

Columbia St.

W 8th St. to NW 45th St.

Bicycle & trail

$35,000

219

Vancouver

Mill Plain Blvd.

Garrison Rd. to NE 104th Ave.

Bicycle & trail

$65,000

220

Vancouver

Fourth Plain Blvd.

Ft. Vancouver Way to Andresen Rd.

Bicycle & trail

$100,000

221

Vancouver

Andresen Rd.

Mill Plain Blvd. to Evergreen Blvd.

Bicycle & trail

$15,000

222

Vancouver

Columbia Way

Columbia Shores to Marine Park

Bicycle & trail

$60,000

223

Vancouver

Lincoln St.

NW 39th St. to Bernie Dr.

Bicycle & trail

$65,000

224

Vancouver

Garrison Rd.

Mill Plain Blvd. to 14th St.

Bicycle & trail

$20,000

225

Vancouver

Q St.

St. Johns Rd. to 33rd St.

Bicycle & trail

$80,000

227

WSDOT

I-5

Interstate Bridge

Predesign engineering

$1,000,000

228

WSDOT

SR-14

NW 6th Ave. (Camas) to 32nd St. (Washougal)

Widen to 4 lanes

$21,000,000

229

WSDOT

SR-500

At St. John’s Blvd.

Construct interchange

$19,000,000

230

WSDOT

SR-500

At 42nd Ave.

Grade separation

$5,000,000

232

WSDOT

SR-502

Duluth to Battle Ground (west city limits)

Widen, 2 lanes each direction (construction dollars only)

$13,900,000

234

WSDOT

I-205

NE 18th St./Burton Rd.

18th St. ramps and frontage roads to Burton (Phase 3)

$84,000,000

235

WSDOT

SR-500

At 54th Ave.

Construct interchange

$18,500,000

236

WSDOT

I-205

SR-14 to Mill Plain

SR-14 and Mill Plain ramp separation (Phase 2)

$48,000,000