| TPP Prj. # |
Agency |
Facility |
Location |
Improvements/Project Type |
Estimated Cost |
|||||
|
76 |
Camas |
38th Ave. |
Parker to Bybee |
Widen from 2 to 3 lanes |
$4,468,000 |
|||||
|
77 |
Camas |
NW Brady Rd. |
NW 25th Ave. to NW 16th Ave. |
Widening, installation of bike lanes, shared use path |
$985,000 |
|||||
|
78 |
Camas |
NW 16th Ave. |
Payne Rd. to NW Hood St. |
Widening, bike lanes, restoration |
$766,000 |
|||||
|
79 |
Camas |
Tidland St. |
NW 16th Ave. to NW 18th Ave. |
Improve |
Not available |
|||||
|
80 |
Camas |
NW 18th Ave./SE Payne Rd. |
Tidland St. to NW Pacific Rim Blvd. |
Improve |
Not available |
|||||
|
81 |
Camas |
NW 23rd Ave./NW Cascade |
18th Ave. to NW Sierra |
Street widening; engineering only, not construction |
$47,000 |
|||||
|
82 |
Camas |
NW 23rd Ave. |
NW Astor to NW Sierra |
Shared use path |
$33,000 |
|||||
|
83 |
Camas |
ITS system enhancement. |
Citywide |
In coordination with VAST improvements, install fiber and signal controller to improve signal coordination and efficiency. |
$1,006,000 |
|||||
|
84 |
Camas |
Street lighting |
$400,000 |
|||||||
|
85 |
Camas |
Areawide signal system |
Citywide |
Signal system study to determine future needed signals |
$50,000 |
|||||
|
86 |
Camas |
15-30 acres of right-of-way (ROW) acquisition for road improvement projects |
$7,000,000 |
|||||||
| Camas | TBD | Pavement maintenance— overlays, surface treatments | $6,000,000 |
|||||||
|
88 |
Clark County |
Andresen/Padden interchange |
Interchange |
$15,000,000 |
||||||
|
89 |
Clark County |
Hazel Dell Ave. at 63rd Ave. |
Interchange upgrade |
$350,000 |
||||||
|
90 |
Clark County |
Hazel Dell Ave. at 78th St. |
Interchange upgrade |
$500,000 |
||||||
|
91 |
Clark County |
Hazel Dell Ave. at 99th St. |
Interchange upgrade |
$500,000 |
||||||
|
92 |
Clark County |
Hwy. 99 |
NE 99th St. to NE 117th St. |
Upgrade, 5 lane |
$3,300,000 |
|||||
|
93 |
Clark County |
NE 10th Ave. |
NE 134th St. to NE 154th St. |
Upgrade, 3 lane |
$5,700,000 |
|||||
|
94 |
Clark County |
NE 10th Ave. |
NE 154th to NE 164th St. |
Extension/upgrade, 2 lane |
$6,000,000 |
|||||
|
95 |
Clark County |
NE 119th St. |
Salmon Creek Ave. to NE 72nd Ave. |
Upgrade, 3 lanes |
$10,800,000 |
|||||
|
96 |
Clark County |
NE 119th St. |
NE 72nd Ave. to SR-503 |
Upgrade, 5 lanes |
$20,200,000 |
|||||
|
97 |
Clark County |
NE 119th St. |
SR-503 to NE 172nd Ave. |
Upgrade, 3 lanes |
$16,500,000 |
|||||
|
98 |
Clark County |
NE 137th Ave. |
Vancouver city limits to Fourth Plain |
Upgrade, 3 lanes |
$3,600,000 |
|||||
|
99 |
Clark County |
NE 137th Ave. |
NE 99th St. to NE 119th St. |
New road, 3 lanes |
$5,700,000 |
|||||
|
100 |
Clark County |
NE 137th Ave./ 142nd Ave. |
NE 119th St. to NE 199th St. |
New road, 3 lanes |
$25,100,000 |
|||||
|
101 |
Clark County |
NE Delfel Rd. |
NE 179th St. to NE 184th St. |
Realigned, 3 lanes |
$1,500,000 |
|||||
|
102 |
Clark County |
NE 20th Ave. |
NE 154th St. to NE 15th Ave. |
Upgrade, 3 lanes |
$3,000,000 |
|||||
|
103 |
Clark County |
NE 15th Ave. |
NE 179th St. to SR-502 |
New road, 3 lanes |
$5,800,000 |
|||||
|
104 |
Clark County |
NW 179th St. |
I-5 to NW 11th Ave. |
Upgrade, 5 lanes |
$4,000,000 |
|||||
|
105 |
Clark County |
NE 179th St. |
NE 10th Ave. to NE 29th Ave. |
Upgrade, 5 lanes |
$16,300,000 |
|||||
|
106 |
Clark County |
NE 182nd Ave. at NE 159th St. |
Intersection upgrade |
$500,000 |
||||||
|
107 |
Clark County |
NE 88th St. |
Hazel Dell Ave. to Hwy. 99 |
New road, 3 lanes |
$8,100,000 |
|||||
|
108 |
Clark County |
NE Hwy. 99 at NE 63rd St. |
Intersection upgrade |
$500,000 |
||||||
|
109 |
Clark County |
Padden Pkwy. |
SR-503 |
New interchange |
$17,000,000 |
|||||
|
110 |
Clark County |
NE 179th St. |
NE 29th Ave. to Cramer Rd |
Upgrade, 3 lanes |
$16,100,000 |
|||||
|
111 |
Clark County |
NE 192nd Ave. |
SE 1st St. to NE 18th St. |
Upgrade, 5 lanes |
$5,000,000 |
|||||
|
112 |
Clark County |
NW 11th Ave. |
NW 139th St. to NW 146th St. |
Upgrade, 3 lanes |
$5,000,000 |
|||||
|
113 |
Clark County |
NE 199th St. |
NE 10th Ave. to NE 72nd Ave. |
Upgrade, 3 lanes |
$16,000,000 |
|||||
|
114 |
Clark County |
NE 55th/58th Ave. |
NE 78th St. to NE 88th St. |
New road, 2 lanes |
$3,600,000 |
|||||
|
115 |
Clark County |
NE 99th St. |
NE 172nd Ave. to Ward Rd |
New road, 2 lanes |
$400,000 |
|||||
|
116 |
Clark County |
NE 99th St. |
St. Johns Rd to SR-503 |
New road/upgrade, 3 lanes |
$11,400,000 |
|||||
|
117 |
Clark County |
NE 99th St. |
SR-503 to NE 172nd Ave. |
Upgrade |
$14,600,000 |
|||||
|
118 |
Clark County |
Rosewood Ave. |
NE 102nd Ave. to NE 105th Ave. |
Upgrade, 3 lanes |
$600,000 |
|||||
|
525 |
Ridgefield |
Pioneer Street |
½ mi. west of 45th to I-5 NB ramps |
Widen, 4 lanes |
$13,000,000 |
|||||
|
526 |
Ridgefield |
South 10th Street |
Pioneer St. extension to NE 10th Ave. |
Build, 3 lanes |
$2,782,000 |
|||||
|
527 |
Ridgefield |
NE 10th and 264th Avenue |
Intersection |
Widen |
$602,000 |
|||||
|
528 |
Ridgefield |
South 35th Ave. |
SR 501 to South 15th St. |
Build, 2 lanes |
$1,448,000 |
|||||
|
529 |
Ridgefield |
Reiman Rd. |
SR 501 to North 10th St. |
Widen |
$3,353,000 |
|||||
|
530 |
Ridgefield |
Hillhurst Rd. and South Royle Rd. |
Intersection |
Widen |
$722,000 |
|||||
|
531 |
Ridgefield |
Hillhurst Rd. |
SR 502 to Royle Rd. |
Widen |
$4,053,000 |
|||||
|
532 |
Ridgefield |
New lane |
I-5 to Pioneer St. |
Construct NB deceleration lane |
$282,000 |
|||||
|
533 |
Ridgefield |
New lane |
Pioneer St. to I-5 |
Construct SB acceleration lane |
$562,000 |
|||||
|
534 |
Ridgefield |
New lane |
Pioneer St. to I-5 |
Construct NB acceleration lane |
$562,000 |
|||||
|
535 |
Ridgefield |
Pioneer Street |
½ mi. west of South 45th |
Widen, 3-4 lanes |
$4,178,000 |
|||||
|
536 |
Ridgefield |
Timm Road |
South 6th Way to South 15th St. |
Widen |
$999,254 |
|||||
|
537 |
Ridgefield |
8th Street |
Pioneer St. to Division St. |
Upgrade/ extend |
$1,166,000 |
|||||
|
538 |
Ridgefield |
Main Street |
Depot St. to City limits |
Upgrade |
$288,000 |
|||||
|
119 |
Vancouver |
15th St. |
At D St. |
New signal |
$300,000 |
|||||
|
120 |
Vancouver |
6th St. |
Columbia to Esther |
Pedestrian crossing/access management enhancements |
$250,000 |
|||||
|
121 |
Vancouver |
Andresen Rd. |
At MacArthur Blvd. |
Intersection improvement/roundabout |
$300,00 |
|||||
|
122 |
Vancouver |
Broadway Ave. |
Fourth Plain to 27th St. |
Minor widening to eliminate intersection offset |
$150,000 |
|||||
|
123 |
Vancouver |
Columbia St. |
At 6th St. |
Intersection improvements |
$150,000 |
|||||
|
124 |
Vancouver |
Downtown |
Traffic signal and system project to improve intersections, signal upgrades and communications interconnect |
$1,750,000 |
||||||
|
125 |
Vancouver |
E Mill Plain Blvd. |
At 136th Ave. |
Intersection modification/widening |
$1,250,000 |
|||||
|
126 |
Vancouver |
E Fourth Plain Blvd. |
I-5 to I-205 |
ITS communications and signal upgrades |
$912,000 |
|||||
|
127 |
Vancouver |
E Mill Plain Blvd. |
At D St. |
New signal |
$300,000 |
|||||
|
128 |
Vancouver |
E Mill Plain Blvd. |
At Chaklov Dr. |
Intersection modification/widening to add a SB to WB turn lanes and others |
$1,000,000 |
|||||
|
129 |
Vancouver |
E Mill Plain Blvd. |
At Garrison Rd. |
Intersection modification/signal upgrade |
$300,000 |
|||||
|
130 |
Vancouver |
E Mill Plain Blvd. |
At SE 155th Ave. |
New signal |
$250,000 |
|||||
|
131 |
Vancouver |
Esther St. |
At 6th St. |
Intersection modification/ roundabout |
$350,000 |
|||||
|
132 |
Vancouver |
Esther St. |
4th St. to 5th St. |
Street modification—-lowering grade |
$350,000 |
|||||
|
133 |
Vancouver |
Esther St. |
At railroad berm |
Add new street access portal through railroad berm |
$2,583,000 |
|||||
|
134 |
Vancouver |
Fourth Plain Blvd. |
At Norris Ave. |
Intersection enhancement-signal |
$300,000 |
|||||
|
135 |
Vancouver |
Fruit Valley Rd. |
Whitney Rd to NW 78th St. |
Temporary safety improvement, shoulder widening, lane narrowing, turn lane at Bernie |
$510,000 |
|||||
|
136 |
Vancouver |
Hearthwood Blvd. |
At SE 1st St. |
Intersection modification/ roundabout |
$300,000 |
|||||
|
137 |
Vancouver |
Mill Plain, 164th Ave., Burton Rd., Andresen Blvd., Fourth Plain Blvd., Main St. |
Every 0.5 miles |
Install ITS arterial detectors to manage system |
$1,700,000 |
|||||
|
138 |
Vancouver |
Mill Plain Blvd., Fourth Plain Blvd., 164th Ave, 192nd Ave., Burton Rd., Andresen Blvd., 112th Ave., Thurston Way, Van Mall Dr. |
Install closed circuit TV cameras for detection on major urban arterials |
$1,600,000 |
||||||
|
139 |
Vancouver |
Mill Plain Blvd., Fourth Plain Blvd., 164th Ave., 192nd Ave. |
Install probe vehicle detectors to manage traffic flow on select corridors |
$700,000 |
||||||
|
140 |
Vancouver |
ITS VAST traffic management center and equipment |
$500,000 |
|||||||
|
141 |
Vancouver |
13th St. |
At Jefferson and Kauffman |
Street reconfiguration to remove offset intersection |
$645,000 |
|||||
|
142 |
Vancouver |
Main St. |
At NE 37th Ave. |
Signal upgrade |
$200,000 |
|||||
|
143 |
Vancouver |
Main St. |
At 33rd St. |
Intersection improvement for capacity/safety |
$250,000 |
|||||
|
144 |
Vancouver |
Main St. |
At NE 39th St. |
Intersection improvement for capacity/safety |
$500,000 |
|||||
|
145 |
Vancouver |
McGillivray Blvd. |
At SE 166th Ave. |
$250,000 |
||||||
|
146 |
Vancouver |
McGillivray Blvd. |
At Village Lp. Rd. |
Intersection modification/safety |
$300,000 |
|||||
|
147 |
Vancouver |
NE 104th Ave |
14th St. to 18th St. |
New street connection—corridor completion |
$2,675,000 |
|||||
|
148 |
Vancouver |
NE 122nd Ave. |
NE 39th St. to NE 49th St. |
Upgrade to urban collector standard |
$1,000,000 |
|||||
|
149 |
Vancouver |
NE 137th Ave |
NE 39th St. to north city limits |
Upgrade to minor arterial standard |
$6,150,000 |
|||||
|
150 |
Vancouver |
NE 138th Ave. |
NE 18th St. to NE 28th St. |
Upgrade to minor arterial street |
$7,125,000 |
|||||
|
151 |
Vancouver |
NE 138th Ave. |
NE 28th St. to NE 39th St. |
Upgrade to minor arterial standard |
$4,850,000 |
|||||
|
152 |
Vancouver |
NE 18th St. |
NE 97th Ave. to NE 138th Ave. |
Upgrade to arterial standard with new signals |
$28,858,000 |
|||||
|
153 |
Vancouver |
NE 18th St. |
NE 138th Ave. to NE 162nd Ave. |
Upgrade to arteral standard with new signals |
$13,232,000 |
|||||
|
154 |
Vancouver |
NE 4th St. |
Western terminus to SE 1st St. |
New street connection to arterial standards |
$1,268,000 |
|||||
|
155 |
Vancouver |
NE 94th Ave. |
Van Mall Dr. to NE 54th St. |
Upgrade to collector arterial standard |
$1,200,000 |
|||||
|
156 |
Vancouver |
NE Van Mall Dr. |
NE Andresen Rd. to NE 66th Ave. |
New street connection to arterial standard |
$732,000 |
|||||
|
157 |
Vancouver |
NW 26th Ave. |
Fourth Plain to Fruit Valley Rd. |
New street minor arterial/industrial standard |
$12,550,000 |
|||||
|
158 |
Vancouver |
NW 39th St. |
At Columbia St. |
Intersection modification/ safety/capacity |
$250,000 |
|||||
|
159 |
Vancouver |
SE 10th/ McGillivray |
At Chkalov Dr. |
Intersection modification/signal |
$300,000 |
|||||
|
160 |
Vancouver |
SE 136th Ave. |
At SE 7th St. |
Intersection modification/access control/signal |
$350,000 |
|||||
|
161 |
Vancouver |
SE 164th Ave. |
At McGillivray |
Intersection modification/safety |
$401,000 |
|||||
|
162 |
Vancouver |
SE 164th Ave. |
At SE 34th St. |
Intersection modification/capacity |
$1,250,000 |
|||||
|
163 |
Vancouver |
SE 164th Ave. |
At SR-14 EB on-ramp |
Ramp modification for capacity |
$1,500,000 |
|||||
|
164 |
Vancouver |
SE 166th Ave. |
Approx–imately SE 15th St. to SE 20th St. |
New connector access road |
$800,000 |
|||||
|
165 |
Vancouver |
SE 188th Ave. |
E Mill Plain Ext. to SE 1st St. |
New street—arterial connection |
$625,000 |
|||||
|
166 |
Vancouver |
SE 1st St. |
SE 164th Ave to E city limits |
Upgrade to modified principal arterial standard |
$2,385,000 |
|||||
|
167 |
Vancouver |
SE 20th St. |
At SE 176th Ave. |
Intersection control (urban roundabout) |
$300,000 |
|||||
|
168 |
Vancouver |
SE 20th St. |
SE 192nd Ave. to Camas |
New street connection—minor arterial standard |
$1,750,000 |
|||||
|
169 |
Vancouver |
St Johns Blvd. |
Ft Vancouver Way to E 33rd St. |
Street enhancement/access management for capacity/safety |
$750,000 |
|||||
|
170 |
Vancouver |
Vancouver Mall Dr. |
Loop Rd. to Fourth Plain |
Minor widening and signal upgrades for capacity |
$500,000 |
|||||
|
171 |
Vancouver |
Vancouver Mall Dr. |
Extension: Andresen to 66th |
New street connection—collector arterial |
$807,000 |
|||||
|
172 |
Vancouver |
VAST III |
ITS system deployment and maintenance |
Signal/ITS system deployment |
$2,024,000 |
|||||
|
173 |
Vancouver |
W Mill Plain Blvd. |
At Columbia St. |
Signal modification/upgrade |
$250,000 |
|||||
|
174 |
Vancouver |
Andresen Rd. |
Fourth Plain Blvd. to 40th St. |
Pedestrian safety & mobility |
$165,000 |
|||||
|
175 |
Vancouver |
W 7th St. |
I-5 overcrossing |
Pedestrian safety & mobility |
$4,406,000 |
|||||
|
176 |
Vancouver |
Lincoln Ave. |
NW 43rd St. to Bernie Dr. |
Pedestrian safety & mobility |
$490,000 |
|||||
|
177 |
Vancouver |
Mill Plain Blvd. |
Reserve St. to Brandt Rd. |
Pedestrian safety & mobility |
$184,000 |
|||||
|
178 |
Vancouver |
Fourth Plain Blvd. |
Todd Rd. |
Pedestrian safety & mobility |
$150,000 |
|||||
|
179 |
Vancouver |
North half Vancouver Mall Lp. |
NE 82nd Ave. to Vancouver Mall Dr. |
Pedestrian safety & mobility |
$147,000 |
|||||
|
180 |
Vancouver |
49th St. |
15th St. to St. James Rd. |
Pedestrian safety & mobility |
$441,000 |
|||||
|
181 |
Vancouver |
Mill Plain Blvd. |
NE 155th Ave. to 160th Ave. |
Pedestrian safety & mobility |
$200,000 |
|||||
|
182 |
Vancouver |
Pedestrian education program |
Citywide |
Pedestrian safety & mobility |
$75,000 |
|||||
|
183 |
Vancouver |
Andresen Rd. |
Evergreen Blvd. to Highland Dr. |
Pedestrian safety & mobility |
$76,000 |
|||||
|
184 |
Vancouver |
McGillivray Blvd. |
Chkalov Dr. to Talton Ave. |
Pedestrian safety & mobility |
$342,000 |
|||||
|
185 |
Vancouver |
Franklin St. |
NW 48th St. to NW 54th St. |
Pedestrian safety & mobility |
$152,000 |
|||||
|
186 |
Vancouver |
McGillivray Blvd. |
Talton Ave. to 18th St. |
Pedestrian safety & mobility |
$73,500 |
|||||
|
187 |
Vancouver |
33rd St. |
I-5 to Grand Blvd. |
Pedestrian safety & mobility |
$310,000 |
|||||
|
188 |
Vancouver |
Andresen Rd. |
Buena Vista Dr. to Iowa St. |
Pedestrian safety & mobility |
$120,000 |
|||||
|
189 |
Vancouver |
Fourth Plain Blvd. |
Whitman to 83rd Ave. |
Pedestrian safety & mobility |
$200,000 |
|||||
|
190 |
Vancouver |
Sidewalk maintenance program |
Citywide |
Pedestrian safety & mobility |
$500,000 |
|||||
|
191 |
Vancouver |
Main St. |
W 33rd St. to NW 39th St. |
Pedestrian safety & mobility |
$50,000 |
|||||
|
192 |
Vancouver |
Grand Blvd. |
Columbia House Blvd. to 5th St. |
Pedestrian safety & mobility |
$147,000 |
|||||
|
193 |
Vancouver |
Evergreen Blvd. |
Blandford Dr. to SR-14 |
Pedestrian safety & mobility |
$294,000 |
|||||
|
194 |
Vancouver |
F St. |
McLoughlin Blvd. to 39th St. |
Bicycle & trail |
$50,000 |
|||||
|
195 |
Vancouver |
Macarthur Blvd. |
Mill Plain Blvd. To Lieser Rd. |
Bicycle & trail |
$40,000 |
|||||
|
196 |
Vancouver |
Nicholson Rd. |
Burnt Br. Greenway trail to Falk Rd. |
Bicycle & trail |
$30,000 |
|||||
|
197 |
Vancouver |
McLoughlin Blvd. |
Franklin St. to C St. |
Bicycle & trail |
$20,000 |
|||||
|
198 |
Vancouver |
NE 107th Ave. |
NE 14th St. to NE 18th St. |
Bicycle & trail |
$80,000 |
|||||
|
199 |
Vancouver |
NE 148th/NE 152nd Ave. |
NE 18th St. to NE 48th St. |
Bicycle & trail |
$60,000 |
|||||
|
200 |
Vancouver |
NE 40th/41st/77th |
Andresen Rd. to Vancouver Mall Dr. |
Bicycle & trail |
$60,000 |
|||||
|
201 |
Vancouver |
NE 41st St. |
NE 112th Ave. to NE 122nd Ave. |
Bicycle & trail |
$35,000 |
|||||
|
202 |
Vancouver |
NE 65th Ave. |
Fourth Plain Blvd. to 18th St. |
Bicycle & trail |
$50,000 |
|||||
|
203 |
Vancouver |
Lincoln Ave. |
Mill Plain Blvd. to NW 39th St. |
Bicycle & trail |
$100,000 |
|||||
|
204 |
Vancouver |
Plomondon St. |
Falk Rd. to Stapleton |
Bicycle & trail |
$35,000 |
|||||
|
205 |
Vancouver |
Jefferson St. |
W 8th St. to W 13th St. |
Bicycle & trail |
$60,000 |
|||||
|
206 |
Vancouver |
Main St. |
Fourth Plain Blvd. to 45th St. |
Bicycle & trail |
$15,000 |
|||||
|
207 |
Vancouver |
E/NE Mill Plain Blvd. |
E Reserve St. to Brandt Rd. |
Bicycle & trail |
$60,000 |
|||||
|
208 |
Vancouver |
Highway 99 |
Main St. to 63rd St. |
Bicycle & trail |
$2,000,000 |
|||||
|
209 |
Vancouver |
Mill Plain Blvd. |
C St. to Columbia St. |
Bicycle & trail |
$10,000 |
|||||
|
211 |
Vancouver |
Bicycle Rack Program |
Citywide |
Bicycle & trail |
$75,000 |
|||||
|
212 |
Vancouver |
Bicycle Education Program |
Citywide |
Bicycle & trail |
$100,000 |
|||||
|
213 |
Vancouver |
5th St. |
E Reserve St. to Evergreen Blvd. |
Bicycle & trail |
$95,000 |
|||||
|
214 |
Vancouver |
NE 54th St. |
Ross St. to St. James Rd. |
Bicycle & trail |
$40,000 |
|||||
|
215 |
Vancouver |
NE 54th St. |
NE 82nd Ave. to NE 94th St. Ave. |
Bicycle & trail |
$50,000 |
|||||
|
216 |
Vancouver |
Devine Rd. |
18th St. to Buena Vista Dr. |
Bicycle & trail |
$20,000 |
|||||
|
217 |
Vancouver |
39th St. |
F St. to Fruit Valley Rd. |
Bicycle & trail |
$20,000 |
|||||
|
218 |
Vancouver |
Columbia St. |
W 8th St. to NW 45th St. |
Bicycle & trail |
$35,000 |
|||||
|
219 |
Vancouver |
Mill Plain Blvd. |
Garrison Rd. to NE 104th Ave. |
Bicycle & trail |
$65,000 |
|||||
|
220 |
Vancouver |
Fourth Plain Blvd. |
Ft. Vancouver Way to Andresen Rd. |
Bicycle & trail |
$100,000 |
|||||
|
221 |
Vancouver |
Andresen Rd. |
Mill Plain Blvd. to Evergreen Blvd. |
Bicycle & trail |
$15,000 |
|||||
|
222 |
Vancouver |
Columbia Way |
Columbia Shores to Marine Park |
Bicycle & trail |
$60,000 |
|||||
|
223 |
Vancouver |
Lincoln St. |
NW 39th St. to Bernie Dr. |
Bicycle & trail |
$65,000 |
|||||
|
224 |
Vancouver |
Garrison Rd. |
Mill Plain Blvd. to 14th St. |
Bicycle & trail |
$20,000 |
|||||
|
225 |
Vancouver |
Q St. |
St. Johns Rd. to 33rd St. |
Bicycle & trail |
$80,000 |
|||||
|
227 |
WSDOT |
I-5 |
Interstate Bridge |
Predesign engineering |
$1,000,000 |
|||||
|
228 |
WSDOT |
SR-14 |
NW 6th Ave. (Camas) to 32nd St. (Washougal) |
Widen to 4 lanes |
$21,000,000 |
|||||
|
229 |
WSDOT |
SR-500 |
At St. John’s Blvd. |
Construct interchange |
$19,000,000 |
|||||
|
230 |
WSDOT |
SR-500 |
At 42nd Ave. |
Grade separation |
$5,000,000 |
|||||
|
232 |
WSDOT |
SR-502 |
Duluth to Battle Ground (west city limits) |
Widen, 2 lanes each direction (construction dollars only) |
$13,900,000 |
|||||
|
234 |
WSDOT |
I-205 |
NE 18th St./Burton Rd. |
18th St. ramps and frontage roads to Burton (Phase 3) |
$84,000,000 |
|||||
|
235 |
WSDOT |
SR-500 |
At 54th Ave. |
Construct interchange |
$18,500,000 |
|||||
|
236 |
WSDOT |
I-205 |
SR-14 to Mill Plain |
SR-14 and Mill Plain ramp separation (Phase 2) |
$48,000,000 |
|||||