TPP Prj. #

Agency

Facility

Location

Improvements/Project Type

Estimated
Cost

1

Battle Ground

Onsdorff

At SR-503

Signal and road extension

$500,000

2

Camas

SE 1st St./NW Lake Rd

SE 192nd Ave. to Leadbetter Pkwy.

Widen, 2 lanes each direction, center left turn

$8,678,000

3

Camas

NW 18th Ave.

NW Astor to NW 16th, include NW Hood

Widen curb, sidewalk

$831,000

4

Camas

NW Leadbetter Rd.

NW Lake Rd. to NW Parker St.

Construct new 2-lane road with bike lanes

$3,847,000

5

Camas

NW 38th Ave.

NW Parker to NW Sierra

Widen, add bike lanes

$5,525,000

6

Camas

3rd

At Crown

Install traffic signal, stripe turn lane

$50,000

7

Camas

3rd

At Lechner

Add turn lane and re-stripe approach

$40,000

8

Camas

8th

At Lechner

Strip and add right turn lane

$50,000

9

Camas

Pacific Rim Blvd.

At Payne

Install traffic signal

$150,000

10

Camas

6th

At Norwood

Install traffic signal

$150,000

11

Camas

SR-14

At 6th

City share of interchange improvement

$1,800,000

12

Camas

Camas Meadows

At Goodwin

Install traffic signal

$150,000

 

Camas

Citywide

 

Reconstruction Projects

$1,018,000

13

Camas

1st

At Payne

Install traffic signal at main North Dwyer Creek entrance

$150,000

14

C-TRAN

Park & Ride

99th St. Park & Ride

Construct new facility

$4,300,000

15

Clark County

NE 162nd Ave.

NE 39th St. to NE Ward Rd.

Upgrade, 5 lanes

$10,600,000

16

Clark County

Salmon Creek (Betts) Bridge

Replacement

$3,300,000

17

Clark County

NE 117th/119th Ave.

Hwy. 99 to east of Salmon Cr.

Upgrade to 3 lanes

$400,000

18

Clark County

NE 134th St.

Rockwell to WSU

Upgrade, 3 lanes

$360,000

19

Clark County

NE 15th Ave.

NE Union Rd. to NE 179th St.

Upgrade, 3 lanes

$4,300,000

20

Clark County

NE 199th St.

SR-503 to NE 142nd Ave.

Upgrade, 3 lanes

$900,000

21

Clark County

NE 72nd Ave.

North of NE 88th St. to NE 119th St.

Upgrade, 5 lanes

$8,400,000

22

Clark County

NE 76th St.

SR-503 to NE 142nd Ave.

Upgrade, 3 lanes

$3,900,000

23

Clark County

NE Covington Rd.

NE 102nd Ave. to NE 76th St.

Upgrade, 3 lanes

$400,000

24

Clark County

NE Hwy. 99

NE 20th Ave. to NE 134th St.

Upgrade, 5 lanes

$8,000,000

25

Clark County

NE St. Johns Rd.

NE 50th Ave. to NE 72nd Ave.

Upgrade, 5 lanes

$10,200,000

26

Clark County

NE Ward Rd./ 99th St.

Ward Rd. at NE 172nd Ave. and NE 182nd Ave.

Upgrade, 2 lanes, intersection improvements

$6,300,000

27

Clark County

NW 117th/119th St.

NW 7th Ave. to NE Hazel Dell

New road, 3 lanes

$5,500,000

28

Clark County

NE 76th St.

NE 94th Ave. to NE 107th Ave.

Upgrade, 3 lanes

$1,800,000

29

Clark County

Hazel Dell Ave.

NE 99th St. to NE 114th St.

Upgrade, 3 lanes

$5,000,000

30

Clark County

NE 117th Ave.

Hazel Dell Ave. to Hwy. 99

Upgrade, 3 lanes

$4,300,000

31

Clark County

NE Heisson Rd./ 244th St.

Intersection improvement

$400,000

32

Clark County

NE 137th Ave.

Fourth Plain to NE 76th St.

Upgrade, 3 lanes

$1,500,000

33

Clark County

Hwy. 99

South RR Bridge to NE 63rd St.

Upgrade, 5 lanes

$4,200,000

35

Clark County

NE 10th Ave.

Carty Rd to NE 259th St.

Upgrade, 2 lanes

$3,500,000

36

Clark County

I-5/NE 139th-134th interchange

NE 10th Ave. to NE 20th Ave.

County share of project, 3 & 5 lanes

$27,000,000

37

Clark County

NE 63rd St.

Andresen Rd to I-205

Upgrade, 3 lanes

$6,600,000

38

Clark County

NE 88th St.

Hwy. 99 to Andresen Rd.

New road/upgrade, 3 lanes

$24,100,000

39

Clark County

SE 1st St.

NE 192nd Ave. to Parker St.

Upgrade, 4 lanes, Camas lead

$0

504

Ridgefield

Pioneer St.

S. 5th St. to NE 10th Ave.

New construction on new alignment

$2,633,000

505

Ridgefield

Pioneer St.

I-5 to S. 5th Ave.

Construct extension of Pioneer Ave. in new alignment

$2,000,000

506

Ridgefield

45th Ave. and Pioneer St.

Intersection

Intersection control

$225,000

507

Ridgefield

11th Ave. and Pioneer St.

Intersection

Signalization

$500,000

508

Ridgefield

56th Ave. and Pioneer St.

Intersection

Signalization

$225,000

509

Ridgefield

Reiman Rd. and Pioneer St.

Intersection

Reconstruction

$750,000

510

Ridgefield

Pioneer St.

I-5 interchange to 45th Ave.

Widen and improve site distances

$2,000,000

511

Ridgefield

35th Ave. and Pioneer St.

Intersection

Intersection control and geometric improvements

$225,000

512

Ridgefield

Mill Street Railroad Crossing

Mill St. and tracks

Rebuild crossings to improve site distances, crossing gradients and signalization

$400,000

513

Ridgefield

Division St. Railroad Crossing

 

Rebuild crossing to improve site distance and gradients

$400,000

514

Ridgefield

Downtown Streetscape

9th St on Pioneer & Sargent to S. Main Ave. on Pioneer St.

Update streetscape, eliminate overhead wires, improve sidewalks, resurface streets, curbs, gutters, storm sewer, ADA sidewalks

$1,500,000

515

Ridgefield

Timm Road

North Terminus

Close Timm Rd. access to Pioneer St.

$85,000

516

Ridgefield

N. 5th Ave.

Pioneer to Division St.

Reconstruct curb and sidewalk

$277,000

517

Ridgefield

NE 10th Ave.

S. 10th Way to S. 5th St.

Reconstruct

$500,000

518

Ridgefield

Various streets

 

Repair supplies and materials

$6,000

519

Ridgefield

N. 45th Ave.

Pioneer Ave. to City limits

Chip seal/ repair

$12,000

520

Ridgefield

Division St.

Existing sidewalk to Abrams bridge

Complete sidewalk to Abrams Park

$20,000

521

Ridgefield

Bertsinger, S. 1st, 2nd, 4th Way

Pioneer to City limits

Minor widening, patch and seal coat

$18,000

522

Ridgefield

Main Ave.

Sargeant to N. City limits

Overlay

$80,000

523

Ridgefield

Pioneer

Pioneer to N. Main Ave.

Signalization of intersection

$225,000

524

Ridgefield

269th St./I-5 interchange

 

Access Decision Report

$500,000

40

Vancouver

7th St. Superblock Crossing

Columbia and Washington

Pedestrian crossing

$398,000

41

Vancouver

Andresen Rd.

Mill Plain Blvd. to Fourth Plain Blvd.

Pedestrian improvements

$252,000

42

Vancouver

Confluence Project

SR-14

Land bridge

$1,000

43

Vancouver

E Mill Plain

Ft. Vancouver Way to E Reserve

Sidewalks

$300,000

44

Vancouver

Franklin School

NW 46th St. to NW 58th St.

Safety enhancement

$298,000

45

Vancouver

Mill Plain Blvd.

87th Ave. to Chkalov

Pedstrian improvements

$330,000

46

Vancouver

Thurston Way

Fourth Plain Blvd. to SR-500

Pedestrian improvements

$120,000

47

Vancouver

Vancouver Amtrak Station

on NW 11th St.

Rehabilitation of existing station building

$680,000

48

Vancouver

E Mill Plain Blvd.

SE 172nd Ave. to 192nd Ave.

Construct 2 lanes each direction with center left turn

$1,000,000

49

Vancouver

Evergreen Blvd

Blanford to Andresen

Installation of guardrails

$190,000

50

Vancouver

Fruit Valley Rd

34th St. to Whitney Rd.

Widen to add center left turn lane; bike lanes; sidewalks

$7,400,000

51

Vancouver

Historic Reserve streets

West Barracks

Reconstruction of historic local street system west of Fort Vancouver Way

$1,600,000

52

Vancouver

Mill Plain Blvd.

I-205 off-ramp improvements

Interchange improvements at Chkalov/flyover ramp to 112th Ave.; City share of project

$17,000,000

53

Vancouver

NE 162nd Ave.

NE 39th St. to north city limits

City share of County lead

$1,000,000

54

Vancouver

NE 28th St.

NE 112th to NE 142nd Ave.

Widen to include center left turn lane, sidewalks, street lights, bike lanes and signals

$6,220,000

55

Vancouver

NE 49th St.

NE 112th Ave. to NE 122nd Ave.

Intersection improvements, add center turn lane, bike lanes, sidewalks, street lights

$2,212,000

56

Vancouver

Burton Rd

NE 86th Ave. to NE 114th Ave.

Widen to include center left turn lane and intersection improvements, add bike lanes, sidewalks, replace bridge crossing

$5,645,000

57

Vancouver

SE 164th Ave.

Evergreen Highway to terminus of 164th Ave.

Scenic overlook and bike trail connection

$270,000

58

Vancouver

SE 192nd Ave.

SE 34th St. to SE Brady Rd

Construct 2 lanes each direction with center turn at specific locations, bike lanes and sidewalks

$12,871,000

59

Vancouver

SE 1st St./NW Lake Rd

SE 192nd Ave. to Leadbetter Pkwy.

Widen, 2 lanes each direction with center left turn; Vancouver share, Camas lead

$115,000

60

Vancouver

Fourth Plain Blvd.

Ft. Vancouver Way to Falk Rd.

 

$500,000

61

Vancouver

NE 49th St.

At NE 122nd Ave.

New traffic signal

$500,000

62

Vancouver

NE Andresen Rd.

At NE 40th St.

New traffic signal

$375,000

63

Vancouver

SE 164th Ave.

At McGillivray Blvd.

New traffic signal

$375,000

64

Vancouver

Thurston Way

At Parkway Dr.

New traffic signal

$325,000

65

Vancouver

Thurston Way

At Vancouver Mall Dr.

New traffic signal

$320,000

66

Vancouver

   

VAST (Vancouver Area Smart Trek)

$3,500,000

67

Vancouver

   

VAST II—-traffic signal integration

$211,000

68

 

Countywide

Interstate, highways, arterials and transit

Intelligent Transportation System (ITS)

$45,000,000

69

WSDOT

I-5

NE 134th St. interchange

Diamond interchange at I-5, ramp reconfiguration at I-205, 23rd Ave. extension to 139th St. and Park & Ride relocation and expansion

$40,000,000

70

WSDOT

I-5

NE 219th St.

New interchange

$34,700,000

71

WSDOT

I-5

Salmon Creek (north of 99th St.) to I-205

Widen, 3 lanes each direction

$34,000,000

72

WSDOT

I-205

Mill Plain interchange vicinity

Flyover ramp to 112th Ave. (Phase 1)

$13,500,000

73

WSDOT

SR-500

At NE 112th Ave.

Construct interchange

$25,000,000

74

WSDOT

SR-502

Duluth to Battle Ground (west city limits)

Widen, 2 lanes each direction (ROW & design only)

$15,000,000